Bookmatched Marble for Boutique Hotel
When the Mandrake opened in London's Fitzrovia last year, the opulent interior of the boutique hotel made great use of natural stone which had been fabricated and installed by stoneCIRCLE.
The Penthouse has a sumptuous bedroom with bookmatched Greylac marble used on the floor and continuing over the bed pedestal and seating platform and then up the TV wall and headboard. The top of the dining table was also in the same marble. The bathing facilities, where polished Mystery White was used throughout for cladding, vanity unit and skirting, include a steam room, dual shower rooms, private and guest toilets and a spacious Jacuzzi under a retractable roof.
The Mandrake Suite featured polished bookmatched Black Wave on the floor and vanity unit which were teamed with copper taps and basins to striking effect.
In all 16 different marbles and granites were used in the guest bathrooms, bars and washrooms as well as the lift floors. The public washrooms in the basement made use of Nero Marquina in the Gents and Mystery White in the Ladies. Both of these were combined in a dramatic geometric design on the walls and floor of the shared hand wash area and the design was continued in polished Neolith Estatuario and Nero San Marcos in a leather finish for the basin pedestal.
More details are available in the stoneCIRCLE website's case study section.
Designer: Beck Interiors
Client: The Mandrake Hotel, London
Stone fabrication & installation: stoneCIRCLE
--Stonecircle 14:41, 13 Jul 2018 (BST)
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.